The project took 4 weeks to be done, considering the possible negotiation with buildings; 5
days for the execution including the rent and the installation of one
platform with 10 meters of track and steel wire ropes (for running the
painting the head of a large printer) where three painters Could work; tube level, plumb, line marking and masking tape; 3
coats of black special paint for the floor and 43 adhesive masks: 43
silhouettes of living creatures drawn in negative with the existing
bottom of the gable, people drawn with the city.